求翻译:In addition, another control block shown in Block C of Fig.7 works to keep the rotor speed to be over 0.7 pu because it is the minimum speed in the wind generator. On the other hand, a blade pitch angle of the wind turbine is adjusted so that the rotor speed does not exceed the maximum limit of 1.3 pu. In this paper, t是什么意思?

待解决 悬赏分:1 - 离问题结束还有
In addition, another control block shown in Block C of Fig.7 works to keep the rotor speed to be over 0.7 pu because it is the minimum speed in the wind generator. On the other hand, a blade pitch angle of the wind turbine is adjusted so that the rotor speed does not exceed the maximum limit of 1.3 pu. In this paper, t
问题补充:

  • 匿名
2013-05-23 12:21:38
此外,在图7中的块C中所示另一控制块的工作,以保持转子速度将超过0.7プ,因为它是在风力发电机的最小速度。
  • 匿名
2013-05-23 12:23:18
此外,另一个控制块中所示的图块C7保持转子速度超过0.7PU是因为它是在最小转速风力发电机。 另一方面,桨距角的风机的调节,以使转子速度不超过最大限制1.3PU。
  • 匿名
2013-05-23 12:24:58
另外,在块显示的另一个控制块C工作保留电动子速度0.7 pu,因为它是极小速度在造风机。 另一方面,调整风涡轮的刀片仰俯角,以便电动子速度不超出1.3 pu最大限度。 在本文,刀片沥青作动器通过使用第一等级塑造时延以时间常数5秒,并且仰俯角改变的率被限制到10度每秒避免剩余机械重音。 最后宁可被确定是输出信号的总和从块A对C在和它是有限的在6MW 0.6 pu之下 (最大输出量) ,因为HHOG消耗4MW (0.4 pu) 在额定的情况。
  • 匿名
2013-05-23 12:26:38
此外,另一个控制块图 7 块 C 所示工作保持转子速度要超过 0.7 铺,因为它是在风力发电机的最小速度。另一方面,风力机桨叶安装角进行调整,这样转子的转速不超过 1.3 铺的最大限制。在本文中,叶片螺距致动器建模第一阶时滞用 5 秒时间常数,并限于 10 度每秒,以避免过量的机械应力的投掷角变化率。最后究竟被确定为输出信号从 a 到 C 图 7,在数目和它限制下的最大输出达 6MW (0.6 pu) 因为 HHOG 会消耗 4mw 秸秆 (0.4 pu) 在额定工况。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 