当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The quality of BIM models was the major concern. The use of BIM models require the input of vast amounts of interconnected data and information that is typically complex. Whilst BIM models have clash detection facilities there are limitations in terms of checking all information. Clients also need to be prepared to inv是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The quality of BIM models was the major concern. The use of BIM models require the input of vast amounts of interconnected data and information that is typically complex. Whilst BIM models have clash detection facilities there are limitations in terms of checking all information. Clients also need to be prepared to inv
问题补充:

  • 匿名
2013-05-23 12:21:38
BIM模型的质量是主要关注的问题。
  • 匿名
2013-05-23 12:23:18
博尔茨曼所促进会的质量模型的主要关注点。 博尔茨曼所促进会的使用模式都需要输入大量的数据和信息互联,通常是复杂的。 虽然博尔茨曼所促进会型号具有冲突检测设施中存在某些限制条款的检查所有信息。 客户端还需要作好准备,在投资的适当发展一个高质量的模型往往是限制带来的顾问费,不足以发展模式所需要的水平。
  • 匿名
2013-05-23 12:24:58
BIM模型的质量是主要关心。 对BIM模型的用途要求的浩大的相当数量输入是典型地复杂的被互联的数据和信息。 BIM模型有碰撞侦查设施有局限根据检查所有信息。 客户在质量模型的适当的发展也需要准备着投资-局限由是不足开发模型对要求的水平的咨询学校费经常达到。 `垃圾的概念在垃圾’为BIM模型一定适用。 责任为对不充分或不正确信息的使用在模型也是主要关心。
  • 匿名
2013-05-23 12:26:38
BIM 模型的质量是主要关注的问题。使用 BIM 模型需要投入大量的互连的数据和信息是通常很复杂。虽然 BIM 模型有冲突检测设施是在检查所有信息的局限性。客户端还需要准备投资于一种质量模型的正确发展 — — 往往限制带来的顾问费不足以建立的模型对水平所需。' 垃圾在垃圾出去的' 概念当然如此 BIM 模型。模型中不足或不正确使用的责任也是信息的一个重大的问题。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭