求翻译:In all cases the time values were assumed uniform along the pipeline.Excavation and landfill soil disposal were assumed up to a maximum depth H exc (s) = 1.2 m along the whole pipeline length.是什么意思?![]() ![]() In all cases the time values were assumed uniform along the pipeline.Excavation and landfill soil disposal were assumed up to a maximum depth H exc (s) = 1.2 m along the whole pipeline length.
问题补充: |
|
2013-05-23 12:21:38
在所有情况下的时间值被假设均匀沿着pipeline.Excavation和填埋土壤处理被假定达到最大深度H EXC (多个) = 1.2米沿整个管道长度。
|
|
2013-05-23 12:23:18
在所有情况下,该时间值是假定一起统一的管道.挖掘和堆填区承担了土壤处理的最大深度H EXC(s)=1.2m的管道长度。
|
|
2013-05-23 12:24:58
在所有的情况下时间值是假设的制服沿管道。挖掘和垃圾填埋土壤处置假设由最大深度H exc决定 (s) = 1.2 m沿整体管道长度。
|
|
2013-05-23 12:26:38
在所有情况下的时间值均假定均匀沿管线。挖掘和填埋场土壤处置均假定到最大深度 H exc (s) = 沿整个管道长度 1.2 米。
|
|