当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:All barrier types and specifications of the barrier steel ruler to Ann construction layout requirements, Ann binding sequence and separately stacked hanging signage, before lashing to clean template debris and drywall landing mortar and template elastic good level standard wire是什么意思?

待解决 悬赏分:1 - 离问题结束还有
All barrier types and specifications of the barrier steel ruler to Ann construction layout requirements, Ann binding sequence and separately stacked hanging signage, before lashing to clean template debris and drywall landing mortar and template elastic good level standard wire
问题补充:

  • 匿名
2013-05-23 12:21:38
所有类型的障碍和阻隔钢尺安建筑布局要求的规格,安结合序列,并分别堆放悬挂标牌,绑扎清理模板碎片和砌墙砂浆登陆模板和弹性较好的水平标准线前
  • 匿名
2013-05-23 12:23:18
所有障碍类型和规格的钢尺的障碍,安建设布局要求,安绑定顺序堆叠和单独悬挂标牌,在绳索,清洁模板碎片和石膏板登陆迫击炮和模板弹性良好水平标准线
  • 匿名
2013-05-23 12:24:58
障碍钢统治者的所有障碍类型和规格对安建筑布局要求、安约束序列和分开地被堆积的垂悬的signage,在清洗模板残骸和干式墙着陆灰浆和模板有弹性好平实标准导线的抨击之前
  • 匿名
2013-05-23 12:26:38
所有障碍类型和规格的安建设布局要求、 安绑定序列和分别堆叠的悬挂标牌,绑扎清洁模板碎片和石膏板登陆砂浆和模板弹性良好水平标准线前的屏障钢统治者
  • 匿名
2013-05-23 12:28:18
都到 Ann 建造布局要求的障碍钢统治者的障碍类型印刷体和规格, Ann 有约束力的顺序和单独堆成堆的悬挂 signage,猛击清理模板碎片和干饰面内墙着陆臼和模板橡皮带之前好程度标准电线
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭