求翻译:One unforeseen issue occurred when one of the PRMs failed, even though they are designed to be redundant and hot-swappable. Under such conditions, there was a sudden doubling in the current requirement for the other PRM, resulting in a decrease in output voltage. To solve this, the software-settable set-point voltage w是什么意思?

待解决 悬赏分:1 - 离问题结束还有
One unforeseen issue occurred when one of the PRMs failed, even though they are designed to be redundant and hot-swappable. Under such conditions, there was a sudden doubling in the current requirement for the other PRM, resulting in a decrease in output voltage. To solve this, the software-settable set-point voltage w
问题补充:

  • 匿名
2013-05-23 12:21:38
发生意外的一个问题时的PRM之一失败,即使它们被设计为冗余和热插拔。
  • 匿名
2013-05-23 12:23:18
一个意外问题时发生了一个行动不便人士的失败,即使它们被设计为冗余和热插拔。 在这种情况下,突然增加了一倍的当前要求的其他的PRM,导致减少的输出电压。 要解决这一问题,软件的设置设置点电压要取决于收债公司的数量。
  • 匿名
2013-05-23 12:24:58
一个未预见到的问题发生了,当一PRMs失败,即使他们被设计是重复和紧迫对换的。 在这样情况下,有一突然加倍在另一PRM的当前要求,造成在产品电压的减退。 要解决此,改变软件settable set-point电压依靠DCAs的数字。
  • 匿名
2013-05-23 12:26:38
未预见到的一个问题之一 PRMs 失败时发生,即使他们生来就是冗余和热插拔。在这种情况下没有其他 PRM,从而减少输出电压的当前需求突然翻了一番。为了解决这个问题,软件可设置的设置点电压更名要依赖 DCAs 数目。
  • 匿名
2013-05-23 12:28:18
一个无法预料的问题在 PRMs 之一失败时出现,即使他们设计是多余和热交换的。在这样的条件下,有突然导致在产量的电压方面的减少在其他 PRM 的当前需求方面加倍。解决这,软件-settable 套点的电压被改为依赖于 DCAs 数量。
 
 