|
关注:1
2013-05-23 12:21
求翻译:In the early days of electronic systems, designers used centralized power architectures (CPA), where all the required voltages were provided by a single “silver box” or open frame supply. As the demands on the power system grew, particularly with the emergence of semiconductor loads such as processors and FPGAs that re是什么意思?![]() ![]() In the early days of electronic systems, designers used centralized power architectures (CPA), where all the required voltages were provided by a single “silver box” or open frame supply. As the demands on the power system grew, particularly with the emergence of semiconductor loads such as processors and FPGAs that re
问题补充: |
|
2013-05-23 12:21:38
在电子系统的初期,设计师采用了集中式电源架构( CPA) ,其中,由单一的“银盒”或开架式电源提供了所有需要的电压。
|
|
2013-05-23 12:23:18
在早期的电子系统,设计人员使用集中式功率架构(CPA),在此处所有的需要的电压是由一个单一的“银牌”或开放式机架电源。 随着需求的电源系统上增加了,尤其是在出现的半导体负载(如处理器和FPGA所需的低电压、高电流耗材、工程师分布式转换器和稳压器在整个系统中。
|
|
2013-05-23 12:24:58
在早期电子系统,设计师使用了集中化力量建筑学 (CPA),一个唯一“银色箱子”或空腹架沟供应提供所有必需的电压。 因为要求在动力系统增长,特别与半导体诞生装载例如必需的低压,高电流供应,工程师分布交换器和管理者在系统中的处理器和FPGAs。 因此问题的装载交换器是提供电压逐步减低的章程的一个普遍的选择,紧挨装载,使能为低压元件需要的更高的潮流。
|
|
2013-05-23 12:26:38
在早期的电子系统,设计师使用集中供电架构 (CPA),在那里所有所需的电压由一个单一提供"银框"或打开框架供应。随着对电力系统的需求,特别是随着半导体载荷的作用,如处理器和 Fpga 所需低电压、 大电流用品、 工程师分布式的转换器和整个系统的监管机构。因此,负载点转换器一直受欢迎的选择,提供电压降压调节,接近负荷,使所需的低电压元件的电流较高。
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区