|
关注:1
2013-05-23 12:21
求翻译:Responsible for forwarding the design, the owner, supervision departments to engineering and technical job requires a variety of materials. Responsible for all the contract content of technical data, regularly collecting, completion of filing requirements. For all measuring instruments to control the whole process of t是什么意思?![]() ![]() Responsible for forwarding the design, the owner, supervision departments to engineering and technical job requires a variety of materials. Responsible for all the contract content of technical data, regularly collecting, completion of filing requirements. For all measuring instruments to control the whole process of t
问题补充: |
|
2013-05-23 12:21:38
负责转发的设计,业主,监理部门的工程技术工作需要的各种材料。
|
|
2013-05-23 12:23:18
负责转发的设计、拥有者、监督部门和工程技术工作需要的各种材料。 负责所有的合同内容的技术资料,定期收集、归档要求的完成。 所有的测量仪器来控制整个进程的这一项目,并且必须要有出厂证书和正常的法律的度量单位核查证书。
|
|
2013-05-23 12:24:58
负责任对向前设计、所有者、监督部门到工程学和技术工作要求各种各样的材料。 负责任对技术数据所有合同内容,通常收集,屑子要求的完成。 为了所有测量仪器能控制这个项目的整体过程,和必须有工厂证明和规则法律测量单位证明证明。
|
|
2013-05-23 12:26:38
负责将设计,所有者,转发监督部门对工程和技术工作需要各种材料。负责技术数据,定期收集,归档的要求完成所有的合同内容。所有测量仪器来控制这一项目的全过程,必须有出厂合格证的和定期对法律单位的计量检定证书。
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区