|
关注:1
2013-05-23 12:21
求翻译:Responsible for forwarding the design, the owner, supervision departments to engineering and technical job requires a variety of materials. Responsible for all the contract content of technical data, regularly collecting, completion of filing requirements. For all measuring instruments to control the whole process of t是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Responsible for forwarding the design, the owner, supervision departments to engineering and technical job requires a variety of materials. Responsible for all the contract content of technical data, regularly collecting, completion of filing requirements. For all measuring instruments to control the whole process of t
问题补充: |
|
2013-05-23 12:21:38
负责转发的设计,业主,监理部门的工程技术工作需要的各种材料。
|
|
2013-05-23 12:23:18
负责转发的设计、拥有者、监督部门和工程技术工作需要的各种材料。 负责所有的合同内容的技术资料,定期收集、归档要求的完成。 所有的测量仪器来控制整个进程的这一项目,并且必须要有出厂证书和正常的法律的度量单位核查证书。
|
|
2013-05-23 12:24:58
负责任对向前设计、所有者、监督部门到工程学和技术工作要求各种各样的材料。 负责任对技术数据所有合同内容,通常收集,屑子要求的完成。 为了所有测量仪器能控制这个项目的整体过程,和必须有工厂证明和规则法律测量单位证明证明。
|
|
2013-05-23 12:26:38
负责将设计,所有者,转发监督部门对工程和技术工作需要各种材料。负责技术数据,定期收集,归档的要求完成所有的合同内容。所有测量仪器来控制这一项目的全过程,必须有出厂合格证的和定期对法律单位的计量检定证书。
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区