当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:5.e. The cost of construction and fitting-out of stands, of the installation at the stands of electric wiring, connections for gas, water drainage and telephone, the use of electric power, gas and water, together with the cost of telephone calls and all other additional costs will be charged to the Participant unless o是什么意思?

待解决 悬赏分:1 - 离问题结束还有
5.e. The cost of construction and fitting-out of stands, of the installation at the stands of electric wiring, connections for gas, water drainage and telephone, the use of electric power, gas and water, together with the cost of telephone calls and all other additional costs will be charged to the Participant unless o
问题补充:

  • 匿名
2013-05-23 12:21:38
5.e.
  • 匿名
2013-05-23 12:23:18
5.e。 成本的建设和装修的支架,安装在支架的电气配线,连接的天然气、排水和电话,使用的电力、燃气及水,加上费用的电话和所有其他额外的费用将会被落案控以参与者除非另有规定,参与的条件。 这些费用应由参与者支付日期后14天内在有关的发票。
  • 匿名
2013-05-23 12:24:58
5.e. 建筑费立场和配件,设施在电接线立场,连接为气体,水排水设备和电话,用途对电力,气体和水,与电话和其他另外的费用一起的费用在参与的条件将被充电对参加者,除非否则规定。 这些充电将由参加者在相关的发货票在14天里支付在日期以后。
  • 匿名
2013-05-23 12:26:38
5.。建筑和装修的立场,在电气接线、 燃气、 排水和电话,连接站安装使用的电力、 燃气及水,以及电话和其他的一切额外费用的成本将费用对参与者除非否则为规定参与的条件。这些费用应由参与者相关的发票上的日期后 14 天内。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭