当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Crossing canal installment: Will be supposed to reserve first generally length of pipe when which will be near with the steel wire hangs, after examined unmistakable again will carry on the cementation, cementation after should square the position rapidly, will decide the adjustment slope according to the gauge, with w是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Crossing canal installment: Will be supposed to reserve first generally length of pipe when which will be near with the steel wire hangs, after examined unmistakable again will carry on the cementation, cementation after should square the position rapidly, will decide the adjustment slope according to the gauge, with w
问题补充:

  • 匿名
2013-05-23 12:21:38
穿越运河分期付款:将应该首先预留长度一般管道时,这将是近用钢丝挂起,检查无误后,将再次进行粘接,粘接后应迅速方块中的位置,将决定根据坡度调整
  • 匿名
2013-05-23 12:23:18
穿过运河批:将本应保留第一个一般的喉管,而长度将与附近的钢线挂起,再次明确了后会继续堆积粘固,堆积粘固后应方形的位置迅速发展,将决定调整的斜坡,用木楔形滤板卡连接稳固、坚实、拆除临时钢丝,过境点间距运河支助将准确
  • 匿名
2013-05-23 12:24:58
横穿运河就职: 将应该一般首先预留管子的长度,当哪些近与钢绳在应该迅速地摆正位置以后垂悬,在被审查的无误再将继续黏接以后,黏接,根据测量仪将决定调整倾斜,与木楔子卡片企业连接,固体,爆破临时钢丝绸,横穿运河支持间距将必须是准确的
  • 匿名
2013-05-23 12:26:38
穿越运河分期付款: 应该保留第一次一般管将附近用钢丝挂后检查, 无误再一次将进行时的胶结,胶结后应广场位置迅速,将决定调整长度边坡根据实际规格,用木楔卡连接牢固、 固体、 拆除临时钢丝绸,穿越运河支撑间距必须准确
  • 匿名
2013-05-23 12:28:18
与运河分期交付相交:将该通常保留第一长度的烟斗哪个跟钢铁电线一起将是近的悬挂时,后面调查明显再次将继续硬化,硬化后面快速地应该弄成直角位置,跟森林楔卡公司团体一起根据量规将决定调整斜坡,固体,破坏临时钢铁丝,留间隔的横过运河支持将必须是准确的
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭