关注:1
2013-05-23 12:21
求翻译:The wall body requests the horizontal even vertical stroke, the mortar joint to be full, does not remain passes the seam.Each wall vertical deviation is not bigger than 5 millimeters, the entire high deviation is not bigger than 20 millimeters, the horizontal ash meets thickness is 8-12 millimeter, elevation allowable 是什么意思? 待解决
悬赏分:1
- 离问题结束还有
The wall body requests the horizontal even vertical stroke, the mortar joint to be full, does not remain passes the seam.Each wall vertical deviation is not bigger than 5 millimeters, the entire high deviation is not bigger than 20 millimeters, the horizontal ash meets thickness is 8-12 millimeter, elevation allowable
问题补充: |
|
2013-05-23 12:21:38
墙体要求横平竖,灰缝要饱满,不留通seam.Each墙面垂直度偏差不大于5毫米,整个高偏差不大于20毫米更大,水平符合灰
|
|
2013-05-23 12:23:18
的
|
|
2013-05-23 12:24:58
墙壁身体请求甚而水平的垂直的冲程,灰浆联接是充分的,不保持通行证缝。每墙壁垂直的偏差5毫米不大于,整个高偏差20毫米不大于,水平的灰遇见厚度是8-12毫米,海拔允许的偏差中的每一是15毫米,窗口,并且门Dongkou位置是正确的,一贯地维护。水平的灰浆联接灰浆充分的丰满度80%,位移裂痕或修造建立长度将应该不小于60毫米一定大于。
|
|
2013-05-23 12:26:38
墙体要求甚至垂直横砂浆联合要充分,不会保持刀缝。每个墙垂直偏差不大于 5 毫米、 整个高偏差不大于 20 毫米,水平灰会见厚度是 8-12 毫米,高程允许偏差,每个为 15 毫米,窗户和门洞口位置是正确的关于保持一致。卧式砂浆联合砂浆完整丰满必须大于 80%,裂缝的位移或生成生成长度应不小于 60 毫米。
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区