当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:This project installment including for draining water, the electrical two systems, divides into cold water, the hot water for the drainage system, drains water three sub-items.Cold water, the hot water pipe, the discharge pipe use the UPVC tube adhesive cementation, draining water use the combined system, each househol是什么意思?

待解决 悬赏分:1 - 离问题结束还有
This project installment including for draining water, the electrical two systems, divides into cold water, the hot water for the drainage system, drains water three sub-items.Cold water, the hot water pipe, the discharge pipe use the UPVC tube adhesive cementation, draining water use the combined system, each househol
问题补充:

  • 匿名
2013-05-23 12:21:38
该项目包括安装给排水,电气两个系统,分为冷水,热水,供排水系统,下水道水三个子items.Cold水,热水管,排水管采用UPVC管粘接胶结
  • 匿名
2013-05-23 12:23:18
这么, 这样地   这; 今, 本; 这个
  • 匿名
2013-05-23 12:24:58
包括为排泄的这项目就职水,电子二个系统,划分成冷水,热水为排水系统,流失水三次级项目。冷水,热水管子,出风管用途UPVC管黏着性黏接,排泄水使用联合的系统,每只家庭设备水公鸡; 电性格照明,插座二次级项目,电源埋葬由开关房子在总配线盒介绍给屋子,然后给用途电分别由总配线盒到用户配线盒器具。当应该严密地时,控制海拔照明器具根据设计,插座开关安装只提供灯持有人到达,安装。每埋葬管道应该在完成前面的涂灰泥事先放置,在表面没有粉刷凿子凹线。所以,根据项目特征,划分成二个专业队和小组,即为排泄水,电 二个队和小组是负责任的设施工作。
  • 匿名
2013-05-23 12:26:38
此项目安装包括给排水、 电气的两个系统,分为冷水,热水供排水系统、 排水三个分项目。冷水、 热水管、 排水管采用 UPVC 管胶粘剂粘接,排水用组合的系统,每个家庭设备水旋塞 ;电力配置照明,由开关房子埋葬了两个分项目,电源插头介绍了房间里总配电箱,然后利用电力分别由总配电箱向用户分发盒装置。照明装置仅提供该灯座设计,插头设置的开关到达,安装时应严格控制高程。每个埋管道应该躺在抹灰完成前提前,而不必粉刷表面上凿槽。因此,根据项目的特点,是分为两个专门的小组和小组,即给排水、 电气的两支球队和团体负责安装工作。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭