求翻译:Before construction technical personnel must seriously familiar with the drawings and relevant technical data, to determine the comprehensive pipeline layout to drainage and fire fighting system in the working medium, flow, pressure, temperature and other technology parameters and the use of materials, equipment types 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Before construction technical personnel must seriously familiar with the drawings and relevant technical data, to determine the comprehensive pipeline layout to drainage and fire fighting system in the working medium, flow, pressure, temperature and other technology parameters and the use of materials, equipment types
问题补充:

  • 匿名
2013-05-23 12:21:38
在施工前技术人员必须认真熟悉图纸和有关技术资料,以确定综合管线布置给排水和消防系统中的工作介质,流量,压力,温度等工艺参数和使用的材料,设备类型
  • 匿名
2013-05-23 12:23:18
施工前技术工作人员必须认真熟悉图纸及有关技术资料,以确定管道的全面布局,排水和消防系统的工作介质,流量、压力、温度和其它技术参数和使用的材料、设备类型清楚地了解,完成较好地了解
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
施工技术人员必须认真熟悉图纸和相关的技术资料,以确定排水和消防系统中工作介质、 流量、 压力、 温度和其它工艺参数和使用的材料,设备类型,要弄清楚,综合管线布局完成之前心中有数
  • 匿名
2013-05-23 12:28:18
在建造之前技术人员必须严重地熟悉素描和相关技术数据,确定全面的管道布局到在工作媒介,流动,压力,温度和其他技术参数中的排水和消防系统和材料的使用,清楚地懂得的设备类型,完成相当好地知道
 
 