当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Construction process, the construction schedule faithfully record each construction process to the start date, completion date and the actual operating time, on the interference factors, with a track record, and analysis, to take effective corrective measures, in order to achieve the goals of the construction schedule是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Construction process, the construction schedule faithfully record each construction process to the start date, completion date and the actual operating time, on the interference factors, with a track record, and analysis, to take effective corrective measures, in order to achieve the goals of the construction schedule
问题补充:

  • 匿名
2013-05-23 12:21:38
施工过程中,施工进度各施工过程中如实记录的开始日期,竣工日期与实际操作时间,对干扰因素,有良好记录和分析,采取有效的纠正措施,以达到的目标
  • 匿名
2013-05-23 12:23:18
施工过程中,施工进度忠实地记录每个施工过程的开始日期、完成日期和实际的操作时间,干扰因素,跟踪记录和分析,采取有效的纠正措施,以实现目标的建设日程安排的
  • 匿名
2013-05-23 12:24:58
建筑过程,建筑日程表忠实地记录每个建筑过程到起始日期、完成日期和实际操作时间,在干涉因素,以记录和分析,采取有效的改正措施,为了达到建筑日程表的目标
  • 匿名
2013-05-23 12:26:38
施工过程中,施工进度忠实地记录每个施工过程对开始日期、 完成日期和实际的操作时间,干扰因素,跟踪记录和分析,采取有效的纠正措施,以实现各项目标的施工进度计划
  • 匿名
2013-05-23 12:28:18
建造过程,建造时间表忠实地到开始日期记载每个建造过程,完成日期和实际运行时间,以一项业绩,分析,在干涉因素上,采取有效矫正的措施,以完成建造时间表的目标
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭