当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:According to the design drawings, stone pre-install theodolite in advance to play at both the sides of vertical control lines, the best play from the Bighorn 20cm on, so feel free to check the accuracy of vertical hanging line to ensure smooth installation. Vertical to hanging line should be with ф 1.0~ ф 1.2 of wire f是什么意思?

待解决 悬赏分:1 - 离问题结束还有
According to the design drawings, stone pre-install theodolite in advance to play at both the sides of vertical control lines, the best play from the Bighorn 20cm on, so feel free to check the accuracy of vertical hanging line to ensure smooth installation. Vertical to hanging line should be with ф 1.0~ ф 1.2 of wire f
问题补充:

  • 匿名
2013-05-23 12:21:38
根据设计图纸,石头提前预安装在经纬仪垂直控制线,从大角20厘米上最好的发挥两侧打,所以随时检查垂直挂线的准确性,保证顺利安装。
  • 匿名
2013-05-23 12:23:18
根据设计图纸、石预安装多行显示,在两侧的垂直控制线,发挥最佳的冷清从20厘米,因此,您可以检查准确性的垂直悬挂线,确保顺利安装。
  • 匿名
2013-05-23 12:24:58
根据设计图,石头事先事先装配经纬仪演奏在垂直的控制线路的两边,最佳的戏剧从大角羊20cm,因此感到自由检查垂直的垂悬的线的准确性保证光滑的设施。 垂直对垂悬的线应该永远是与ф 1.0~ ф导线1.2,底部下沉了铁以高度,并且设置, 40m将军跟随的高度下沉了铁重量为8~10kg,垂悬在热忱的上面垂悬的线角度框架Shang,角度框架用在上面大厦大角度固定的伸缩栓,必须到垂悬在企业中,和准确和容易地接触移动地方和对笔记保护和经常检查。 并且控制线
  • 匿名
2013-05-23 12:26:38
根据设计图纸,石头预安装经纬仪提前来玩,两侧的垂直控制线最好播放 20 厘米大角羊上,以便随时检查垂直挂线,以确保顺利安装的准确性。垂直于挂线应与 ф 1.0 ~ ф 1.2 线为好,底部下沉了铁与高度和一般 40 米以下高度设置,沉铁重量为 8 ~ 10 公斤,最高挂在专用的挂线角架上,用膨胀螺栓固定在建筑物的顶部,大角角框架必须到悬挂在公司里,和准确很容易触摸移动的地方,要注意保护,并经常检查。和控制线
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭