|
关注:1
2013-05-23 12:21
求翻译:Construction workers on the team, head of civil construction workers, Project Chief Engineer, construction manager and construction team for layers of cards on the table. Disclosure the material specification, content require specific, targeted. Disclosure and recipient must sign the disclosure information, and indicat是什么意思?![]() ![]() Construction workers on the team, head of civil construction workers, Project Chief Engineer, construction manager and construction team for layers of cards on the table. Disclosure the material specification, content require specific, targeted. Disclosure and recipient must sign the disclosure information, and indicat
问题补充: |
|
2013-05-23 12:21:38
建筑工人的队伍,头土木建筑工人,项目总工程师,施工经理和施工队伍的卡在桌子上层。
|
|
2013-05-23 12:23:18
建筑工人对团队、头的土木建筑工人、项目首席工程师、施工管理和施工队的卡图层的表上。 披露的材料规格、内容要求具体、有针对性。 信息披露和收信人必须签名信息的披露,并说明在收到
|
|
2013-05-23 12:24:58
建筑工人在队,民用建筑工人头,在桌射出总工程师、建筑经理和建筑队为卡片层数。 透露原材料明细表,内容要求具体,被瞄准。 透露和接收者必须签署透露信息,并且表明收据日期的
|
|
2013-05-23 12:26:38
在队里,头的土建施工人员项目总工程师、 施工项目经理和施工队伍为图层的卡片在桌上的建筑工人。披露材料的规格、 内容要求具体、 有针对性。披露和收件人必须签署披露信息,并注明收到日期
|
|
2013-05-23 12:28:18
小组,头文明建造工人,项目总工程师,建造经理和对于桌子上的卡的层的建造小组上的建造工人。揭发材料规格,内容需要被其作为目标的细节。揭发和收件人必须签署揭发信息,表示收据的日期
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区