当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The engineering requirements of building units according to the bidding documents, the construction period is 730 calendar days, the company with the purpose of "all for customers," the purpose, combined with the design characteristics of the project, our decided to take some of the technical and management measures an是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The engineering requirements of building units according to the bidding documents, the construction period is 730 calendar days, the company with the purpose of "all for customers," the purpose, combined with the design characteristics of the project, our decided to take some of the technical and management measures an
问题补充:

  • 匿名
2013-05-23 12:21:38
建设单位根据招标文件工程要求,施工工期为730日历天,该公司的宗旨是“一切为了客户”的宗旨,结合项目的设计特征,我们决定采取一些
  • 匿名
2013-05-23 12:23:18
这, 那; 这些, 那些
  • 匿名
2013-05-23 12:24:58
建立单位的工程学要求根据出价的文件,基建期间是730个日历,公司为“所有的目的为顾客”,目的,结合与项目,我们的决定的作为的设计特征某些技术和管理措施和保证建筑质量在前提之下根据期限保证为一个项目在建筑任务的质量和数量令人满意的完成。为了达到上述目标,我们将使用并行操作、三维十字架、次级流动的水和其他全面建筑技术措施,并且对空间和时间的充分的用途,缩短建设周期。
  • 匿名
2013-05-23 12:26:38
工程的建设单位按招标文件要求,施工期间是 730 个日历日,本公司以"一切为了客户,"的宗旨,结合项目,我们决定要采取的一些技术和管理措施,保证施工质量,保证工程保质保量圆满完成建设任务的时间限制的前提下设计的特点。为了实现上述目标,我们将使用并行操作、 立体交叉、 子流动水和其他综合施工技术措施,并充分利用空间和时间,缩短施工周期。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待... 正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭