求翻译:Floor later casting zone, taking into account ground water pressure, the lower part of the pad has been poured layer of concrete reinforcement measures taken, deepening local 100, with 100 thick reinforced concrete reinforcement and joining steel plate waterstop, preventing water damage after pouring pressure cushion. 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Floor later casting zone, taking into account ground water pressure, the lower part of the pad has been poured layer of concrete reinforcement measures taken, deepening local 100, with 100 thick reinforced concrete reinforcement and joining steel plate waterstop, preventing water damage after pouring pressure cushion.
问题补充:

  • 匿名
2013-05-23 12:21:38
混凝土加固措施后楼铸造区,考虑到地下水的压力,垫下部已浇筑层采取,深化地方100 , 100厚的钢筋混凝土加固和连接钢板止水带,防止浇压后水渍
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭