求翻译:Engineering practice of recent years we have taken when pouring concrete roof, at the root of wall and column template counters respectively 4m and 2m bars along the leveling scraper to scrape, use iron trowel flat smooth, elevation and flatness deviation control within 2mm, when installing the rubber hose approach, to是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Engineering practice of recent years we have taken when pouring concrete roof, at the root of wall and column template counters respectively 4m and 2m bars along the leveling scraper to scrape, use iron trowel flat smooth, elevation and flatness deviation control within 2mm, when installing the rubber hose approach, to
问题补充:

  • 匿名
2013-05-23 12:21:38
近年来工程实践,我们已经采取浇筑混凝土屋顶的时候,在墙柱模板柜台根分别4米和2M酒吧沿着平整刮刀安装时刮去,用抹子铁光滑平整,标高和平整度偏差控制在2mm以内,
  • 匿名
2013-05-23 12:23:18
工程实践的最近几年,我们采取了灌混凝土屋顶时,在墙上的根目录和列模板计数器分别为4m和2m条沿水平刮板刮伤,使用铁铲刀平面光滑,平整度偏差高程和控制在2mm,当安装橡胶软管连接方式,实现更好的结果
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
近年来的工程实践我们采取时浇注混凝土屋顶、 墙、 柱模板的根分别计数器 4 米和 2 米栏沿调平的刮刀刮掉,铁抹子光滑平整、 高程和平整度偏差控制在 2 毫米内的安装时使用的橡胶软管的办法,以实现更好的结果