求翻译:3) measurement and control: steel banding before, need to be on the floor, door and window wall column position with black line up. Submitted to the supervision inspection, after passing, you can bottom rebar.4) reinforced banding: bottom reinforcement lashing before, first of all in accordance with the requirements of是什么意思?

待解决 悬赏分:1 - 离问题结束还有
3) measurement and control: steel banding before, need to be on the floor, door and window wall column position with black line up. Submitted to the supervision inspection, after passing, you can bottom rebar.4) reinforced banding: bottom reinforcement lashing before, first of all in accordance with the requirements of
问题补充:

  • 匿名
2013-05-23 12:21:38
3 )测量和控制:钢筋绑扎前,需与黑线了地板,门,窗墙列位置。
  • 匿名
2013-05-23 12:23:18
3)测量和控制:钢带之前,需要在地板上,门和窗墙上栏的位置,黑色线。 监督检查,通过后,您可以下rebar.4)增强了条纹:底部加固绳索,首先按照要求加强机械连接的连接使用冷拉伸套管。
  • 匿名
2013-05-23 12:24:58
3) 测量和控制: 钢条带前面,需要在地板上,门和窗口围住列位置与黑联盟。 递交给监督检查,在通过以后,您能基于rebar.4) 被加强的条带: 抨击前面的底下增强,首先所有与被加强的机械连接连接的要求符合使用方式的冷的挤压袖子。 挤压联合位置相互交错排列,在所有联合中心到35次部分酒吧直径的长度,与联接占了,并且增强的部分区域的力量由增强总部分区域的百分比不会超出50%。
  • 匿名
2013-05-23 12:26:38
3) 测量和控制: 钢材捆扎之前,需要在地板上,门和窗壁与黑色的线列位置上。提交的监督检查,通过后, 你可以底 rebar.4) 钢筋绑扎: 底部钢筋绑扎前,首先根据要求的钢筋机械连接连接使用冷挤压套筒的方式。挤压联合位置相互错开,在任何联合中心到栏的长度直径的 35 倍截面接头的占地,和力的总截面积的百分比加固的钢筋截面积不得超过 50%。