求翻译:The foundation slab concrete takes 2 concrete pouring belt as boundary, and divides into three pieces one pouring forming, the vertical construction seam is left in the pouring belt place.2) no horizontal construction joints are left on the base plate. Wall first horizontal construction joints in the high wall on the b是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The foundation slab concrete takes 2 concrete pouring belt as boundary, and divides into three pieces one pouring forming, the vertical construction seam is left in the pouring belt place.2) no horizontal construction joints are left on the base plate. Wall first horizontal construction joints in the high wall on the b
问题补充:

  • 匿名
2013-05-23 12:21:38
基础底板混凝土需要2混凝土浇带作为边界,并划分成三段1浇注成形中,垂直施工缝被留在浇带place.2 )没有水平施工缝留在基板上。
  • 匿名
2013-05-23 12:23:18
该基金会具体时间为2带倒带具体的边界,并划分为三个片倒一个,形成垂直施工缝留在倒带咬合到位。2)没有横向的建筑接缝在基板上。
  • 匿名
2013-05-23 12:24:58
基础平板混凝土在倾吐的传送带水平的建筑联接在基座平板没有被留下的place.2采取2具体倾吐的传送带作为界限,并且划分成三个片断) 一倾吐的形成,垂直的建筑缝离开。 围住第一水平的建筑联接在深堑侧壁在250毫米底面,保留的缝合的建筑联接设置了3mm钢水中止传送带,建筑联合先得权方法提到岗位) 倾吐的传送带被做钢网的drawings.3,木刻和横向支持,并且安排支持的观点图画…
  • 匿名
2013-05-23 12:26:38
基础板混凝土需 2 混凝土浇带作为边界,并分为三个部分一次浇注成形,垂直施工缝留在浇注带 place.2) 没有水平施工缝留在底板上。在高高的围墙上 250 毫米,保留的缝纫建设联合设置 3 毫米钢制供水站带,建设联合留置方法底面墙第一水平施工缝是指 drawings.3) 后浇带由钢网、 木块和横向的支持,并支持意见图纸排列...
  • 匿名
2013-05-23 12:28:18
基础厚平板混凝土花 2 具体倒带子作为边界,分割为倒形成的三件的一个,垂直建造缝在倾泻地带被留下 place.2) 没有水平建造关节在基本盘子被留下。墙在 250 毫米的最后的表面上的高墙中的第一水平建造关节,保留被其 3 毫米钢铁水停止带子的缝建造关节,建造关节留置权方法参考 drawings.3) 倒带子的邮政由钢铁网做成,森林街区,以及跨散文支持,以及支持见解素描被整理 ...
 
 