求翻译:Will be prefabricated pipe section, according to the number shipped to the installation site for installation. The bonding process must be carried out in accordance with the bonding process.. After all the adhesion, the pipeline needs straight, the slope is uniform, and the reserved mouth is accurate.. With fine sand b是什么意思?![]() ![]() Will be prefabricated pipe section, according to the number shipped to the installation site for installation. The bonding process must be carried out in accordance with the bonding process.. After all the adhesion, the pipeline needs straight, the slope is uniform, and the reserved mouth is accurate.. With fine sand b
问题补充: |
|
2013-05-23 12:21:38
将预制管段,根据运至安装现场进行安装的数目。
|
|
2013-05-23 12:23:18
正在翻译,请等待...
|
|
2013-05-23 12:24:58
将是prefabricated管子部分,根据数字运输对设施站点为设施。 必须执行接合过程与接合过程符合。 在所有黏附力以后,直接管道需要,倾斜是一致的,并且后备的嘴是准确的。 与美好的沙子重新填没用管道输送100mm地下管道,叠加的土壤压实筛,不损坏管道。 在水泥管子挂衣架以后根据水流量的方向为倾斜。 最后密封严密的保留和孔。
|
|
2013-05-23 12:26:38
将预制的管节,按数运到安装现场安装。键合过程必须按照键合过程进行。之后所有的附着力,管道需要直、 边坡是统一的和保留的嘴是准确。用细砂回填到管 100 毫米地下管线,筛分,上覆土壤压实不损坏的管道。后水泥管道吊架根据边坡的水流动的方向。最后密封严格预订和孔。
|
|
2013-05-23 12:28:18
将被预制烟斗部分,根据数字发货到对于安装的安装地点。结合过程必须按照结合过程被执行 .. 在所有依附之后,管道需要直线部分,斜坡是统一的,以及保留嘴是准确的 .. 随着吹奏 100 毫米地下管道的好的沙覆土, sieving 的过分躺着的土壤压实,不损坏管道。在根据对于斜坡的水流动的方向的水泥烟斗衣架之后。最终密封严格的预订和孔。
|