当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:(vii)Alternative options analysis should be carried out for all project components including without-project option to demonstrate that the proposed design is technically, economically, environmentally and socially sound solution with reasonable and affordable operation and maintenance (O&M) costs;是什么意思?

待解决 悬赏分:1 - 离问题结束还有
(vii)Alternative options analysis should be carried out for all project components including without-project option to demonstrate that the proposed design is technically, economically, environmentally and socially sound solution with reasonable and affordable operation and maintenance (O&M) costs;
问题补充:

  • 匿名
2013-05-23 12:21:38
(七)替代方案分析应进行工程项目的全部组件,包括无项目选项,以证明所提出的设计在技术上,经济,环境和合理的和负担得起的操作和维护(O &M )成本社会完善的解决方案;
  • 匿名
2013-05-23 12:23:18
(七)其他备选办法分析应当进行所有项目的组成部分包括但不项目选项表明,该提议的设计在技术上、经济上、对环境和社会声卡解决方案合理和可负担得起的操作和维护(O&M)费用;
  • 匿名
2013-05-23 12:24:58
(vii)应该为所有项目组分执行供选择的选择分析包括没有项目选择显示出,提出的设计是技术上,经济上,环境和社会上酣然的解答以合理和付得起的运行和维护 (肿瘤) 费用;
  • 匿名
2013-05-23 12:26:38
(七)应该为所有的项目组件包括如果没有项目选项表明,提出的设计是技术上、 经济上、 环保和社会上的解决办法合理和负担得起的操作与维护 (O & M) 成本; 进行替代方案分析
  • 匿名
2013-05-23 12:28:18
(vii) 供选择的选项分析应该为包括项目的选项的所有项目成分被执行证明拟议的设计在环境方面和在社会中,节约地在技术方面是有合理和能担负得起的操作和维护的稳固的解决方案 (O&M) 花费;
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭