当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The algorithm exhausts all feasible switching options calculat- ing this load Balancing Index Until it reaches a minimum LBI and an optimal or near optimal solution is found. Note that, a feasible switching option is where no connected loads are isolated and no closed loops are created. Moreover, constra是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The algorithm exhausts all feasible switching options calculat- ing this load Balancing Index Until it reaches a minimum LBI and an optimal or near optimal solution is found. Note that, a feasible switching option is where no connected loads are isolated and no closed loops are created. Moreover, constra
问题补充:

  • 匿名
2013-05-23 12:21:38
该算法耗尽了所有可行的开关选项calculat-荷兰国际集团这个负载平衡​​指数直到它达到最小LBI与最优或接近最优的解决方案被发现。
  • 匿名
2013-05-23 12:23:18
耗尽了所有的算法可行切换选项calculat-ING这种负载平衡指数直至其达到一个最小劳合国际和最佳或接近最佳的解决方案。 请注意,一个可行选项切换是不连接负载隔离,没有闭环。
  • 匿名
2013-05-23 12:24:58
算法用尽所有可行的交换机选项calculat- ing这个负载平衡索引,直到它到达极小值LBI,并且一个优选或近的最佳方案被找到。 注意,一个可行的交换机选项是连接的装载没有被隔绝的地方,并且闭合回路不是 创造。 而且, 限制必须是 satis也fi编辑以交点电压在电子财产之内一个被允许的范围、能力和规定值不被超出和系统损失在极小值 (34)。
  • 匿名
2013-05-23 12:26:38
该算法用尽一切可行开关选项逐次这负载平衡指数直到它达到最低的劳和最优或接近最优解发现。请注意,一个可行的开关选项是没有连接的负载是孤立和不封闭的环被创造。 此外,约束也必须感到满意节点的电压在允许的范围、 能力和电气资产不得超过额定值和系统损失要至少 [34]。
  • 匿名
2013-05-23 12:28:18
算法耗尽所有可行转换选项 calculat ing 平衡指数,它拿给 一最小 LBI 和一 的直到 的这负荷的 优化或优化的解决方案附近的 被找到。请注意,一个可行转换选项是哪里连接的没有 装货是被其隔离,不被关闭的 翻 是被创建的 。此外, 约束 也必须是 殉夫自焚?被 ed 以是被允许的一 中的 的节的电压幅度,能力和不要被超过的电资产的等级和是对 最小值的 的系统损失 (34)。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭