当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:8.3. ANY and ALL tool work needed to correct a defect in materials or workmanship, or tool work needed to implement a Motorola authorized Engineering Change, as well as tool work needed to make repairs in response to production tool damage, shall be started only after the proposed tool work has been approved in writing是什么意思?

待解决 悬赏分:1 - 离问题结束还有
8.3. ANY and ALL tool work needed to correct a defect in materials or workmanship, or tool work needed to implement a Motorola authorized Engineering Change, as well as tool work needed to make repairs in response to production tool damage, shall be started only after the proposed tool work has been approved in writing
问题补充:

  • 匿名
2013-05-23 12:21:38
8.3 。
  • 匿名
2013-05-23 12:23:18
8.3*任何和所有工具所需工作的缺陷,正确的材料或工艺缺陷,或工具所需工作的摩托罗拉授权实施工程变更,以及工具工作需要进行维修以响应生产工具的损坏,应开始后仅提议中的工具工作已以书面批准的适当工具摩托罗拉公司工程师。
  • 匿名
2013-05-23 12:24:58
8.3. 其中任一和所有工具工作必要的改正一个瑕疵在材料或手艺或者工具工作需要实施Motorola授权工程变化,以及必要的工具工作进行修理以回应生产工具损伤,将开始,在提出的工具工作被批准了之后以书面方式由适当的Motorola工具工程师。
  • 匿名
2013-05-23 12:26:38
8.3.任何和所有的工具工作需要纠正缺陷材料或做工或实施摩托罗拉授权的工程变更,以及工具工作需要作出回应生产工具损坏,修理所需的工具工作应适当摩托罗拉模具工程师已书面核可了拟议的工具工作后才开始。
  • 匿名
2013-05-23 12:28:18
8.3.任何和所有工具工作需要更正在材料中的一个缺陷或工人资格,或工具工作需要实施被授权的一摩托罗拉设计变化,以及用工具加工被需要回应生产工具损害做出维修的工作,将开始仅仅拟议的工具工作以书面形式被适当的摩托罗拉工具工程师赞同了后。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭