当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:在第一眼勘探孔施工完成后,在垂直地下水流向的方向上距勘探孔10m处各施工1眼观测孔,深度分别为30m和60m是什么意思?

待解决 悬赏分:1 - 离问题结束还有
在第一眼勘探孔施工完成后,在垂直地下水流向的方向上距勘探孔10m处各施工1眼观测孔,深度分别为30m和60m
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
In the first glance exploration hole construction is complete, the vertical groundwater flow in the direction from the exploration hole 10 M, the construction 1 eye observation hole to a depth of 30 M and 60 M
  • 匿名
2013-05-23 12:24:58
Completes after the first exploration hole construction, flows to in the vertical ground water in the direction is apart from exploration hole 10m place to construct 1 observation hole, the depth respectively is respectively 30m and 60m
  • 匿名
2013-05-23 12:26:38
The first exploration holes completed, in the vertical direction of groundwater flow from exploration and construction 1 eye observation of the bore hole 10m, depth, respectively 30m and 60M
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭