求翻译:SUSPENSION: CPTDC PERU, within seven (07) calendar days in advance, shall request the CONTRACTOR the suspension of the Work or shall modify the manner and time (schedule) of its execution, in which case the CONTRACTOR shall make its best efforts to reduce costs related to the suspension or modifications made to the Wor是什么意思?

待解决 悬赏分:1 - 离问题结束还有
SUSPENSION: CPTDC PERU, within seven (07) calendar days in advance, shall request the CONTRACTOR the suspension of the Work or shall modify the manner and time (schedule) of its execution, in which case the CONTRACTOR shall make its best efforts to reduce costs related to the suspension or modifications made to the Wor
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
悬架:秘鲁cptdc在七(7)个日历天内,应要求承包商暂停或不应修改工作的方式和时间(计划)的执行,在这种情况下,承包商应尽最大努力,以降低成本与悬架或所做的修改的工作,其须预先同意和批准,cptdc在书面秘鲁和承包商。 同样地,承包者应重新开始工作,很快,cptdc秘鲁所需。
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
暂停: 本秘鲁,七 (07) 个日历日内提前,应要求承包商暂停工作或应修改的方式和时间 (计划) 的执行情况,承包商应当再一次其尽最大努力减少与暂停或修改工作,并将以前同意并批准在作出有关的费用由本秘鲁和承包商写。同样,承包商应重新启动工作尽快本秘鲁所需。