当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The 24 hour traffic volumes for all the count days were estimated based on the 24 hour counts carried out on a week day and weekend day by applying the equation 1. Table 4.5 indicates a summary of actual traffic counts conducted on DEMBE-KIROWOOZA 公路, while table 4.6 includes estimated 24 hour count figures for Daily t是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The 24 hour traffic volumes for all the count days were estimated based on the 24 hour counts carried out on a week day and weekend day by applying the equation 1. Table 4.5 indicates a summary of actual traffic counts conducted on DEMBE-KIROWOOZA 公路, while table 4.6 includes estimated 24 hour count figures for Daily t
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
24小时的所有交通量的估计数天的基础上24小时数进行了一周,周末一天一天的等式1。 表4.5表示一个汇总的实际进行流量计数Dembe Mengul撤出的kirowooza公路,而表4.6包含估计24小时计数数字每日的交通。
  • 匿名
2013-05-23 12:24:58
24个小时话务量为几天估计的所有计数根据在一星期天和周末天执行的24个小时计数通过运用式1。 而表4.6包括估计24个小时计数形象为每日交通,表4.5表明在DEMBE-KIROWOOZA公路举办的实际通信计数总结。
  • 匿名
2013-05-23 12:26:38
交通量为所有计数天估计基于 24 小时 24 小时计数进行一个工作日和周末一天通过应用方程 1。表 4.5 指示实际交通量在 DEMBE KIROWOOZA 公路上进行而表 4.6 包括日常交通估计 24 小时计数数字摘要。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭