当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The party B is in charge of the salary and the supplement for the technicians for first 45 days on each dredger basis separately and If installation or commission delayed due to buyer reason then the days over 45days shall be chargeable as a salary deducting withholding tax if any and the standard rate per day shall be是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The party B is in charge of the salary and the supplement for the technicians for first 45 days on each dredger basis separately and If installation or commission delayed due to buyer reason then the days over 45days shall be chargeable as a salary deducting withholding tax if any and the standard rate per day shall be
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
乙方负责工资和补编的技术人员,为第一个45天的每个搜寻器基础上,如果单独安装或委员会推迟的原因是买家原因则天超过45天,应可予徵收印花税的薪金扣除预扣税,如果任何的标准费率应每天50美元计算的人均每天的最大3人(1液压系统,01electrical,1机械)。
  • 匿名
2013-05-23 12:24:58
党B分开地是负责薪金和补充为技术员前45天根据每个撒粉瓶依据,并且,如果设施或委员会被延迟的由于买家原因然后天在45days将是可充电的作为扣除预扣赋税的薪金,如果中的任一和每天标准利率将是50美元每人每天为最大值03人 (01动水学, 01Electrical, 01机械)。
  • 匿名
2013-05-23 12:26:38
乙方负责对薪水和补充的技术人员在每个挖泥船的基础上的第一次 45 天分别和如果安装或委员会由于买方原因延误了然后天 45 天须课税作为工资扣除预扣税,如果任何和每日的标准率须为 50 美元每人每天最大 03 人 (01 水力学01Electrical,01 机械)。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭