|
关注:1
2013-05-23 12:21
求翻译:主河槽区域内坝基处理可参考以下典型剖面图(图1、图2)。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
主河槽区域内坝基处理可参考以下典型剖面图(图1、图2)。
问题补充: |
|
2013-05-23 12:21:38
正在翻译,请等待...
|
|
2013-05-23 12:23:18
Main river slot within the region, as well as processing can refer to the following typical drawing (figure 1, figure 2).
|
|
2013-05-23 12:24:58
In below the main riverbed region dam base processing may refer to the typical sectional drawing (Figure 1, Figure 2).
|
|
2013-05-23 12:26:38
Foundation treatment in the main channel area may refer to the following typical profiles (Figure 1, Figure 2).
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区