当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:the Contractor shall warrant for materials, equipment and workmanship furnished, delivered and installed hereunder for a period of 2 (two) years period starting from the date of Temporary Acceptance to be realized in accordance to Article 32 against defects due to poor design, material, workmanship and performance to b是什么意思?

待解决 悬赏分:1 - 离问题结束还有
the Contractor shall warrant for materials, equipment and workmanship furnished, delivered and installed hereunder for a period of 2 (two) years period starting from the date of Temporary Acceptance to be realized in accordance to Article 32 against defects due to poor design, material, workmanship and performance to b
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
承包者应保证,材料、设备和工艺布置,交付并安装了以下一段2(0)年内从开始的日期暂时接纳的实现根据缺陷32条因设计不当、材料、工艺和性能应符合本合同规定文档
  • 匿名
2013-05-23 12:24:58
承包商为材料、设备和手艺将担保在此之下装备,提供和安装在2二年的 (期间) 期间从在依照将体会的临时采纳开始日期对文章32反对瑕疵由于弱图案、材料、手艺和表现是与合同文件的规定符合
  • 匿名
2013-05-23 12:26:38
承包商应保证材料、 设备和工艺装备、 交付和安装合同为期 2 (两个) 年期间从临时验收要条 32 对缺陷由于差设计、 材料、 工艺、 性能要符合合同文件规定根据实现的日期开始
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭