当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Panauti Hydropower Station is the third hydropower station constructed in Nepal. It is a run-of-the-river hydroelectric plant on the Roshi Khola river. It has a capacity of 2.4 MW, from 3 units of 0.8 MW each. The prime mover of each unit is Horizontal Francis turbines. This power station is located at Khopasi, Kavre d是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Panauti Hydropower Station is the third hydropower station constructed in Nepal. It is a run-of-the-river hydroelectric plant on the Roshi Khola river. It has a capacity of 2.4 MW, from 3 units of 0.8 MW each. The prime mover of each unit is Horizontal Francis turbines. This power station is located at Khopasi, Kavre d
问题补充:

  • 匿名
2013-05-23 12:21:38
null
  • 匿名
2013-05-23 12:23:18
Panauti 水力发电站是第三个水力发电站的建造在尼泊尔。 它是一种运行的河水力发电厂在 Roshi Khola 河。 它的容量为 2.4 MW , 由 3 个单位的 0.8 兆瓦。 在原动机的每个单元是水平的弗朗西斯的涡轮机。 该电站位于 Khopasi Kavre 、区、 35 公里的加德满都。
  • 匿名
2013-05-23 12:24:58
Panauti水力发电驻地是在尼泊尔修建的第三个水力发电驻地。 它是一个跑这河水力发电厂在Roshi Khola河。 它有容量2.4兆瓦,从0.8兆瓦3个单位的每个。 每个单位原动力是水平的Francis涡轮。 这个发电站位于Khopasi, Kavre区, 35公里在加德满都东边。
  • 匿名
2013-05-23 12:26:38
Panauti 水电站是构建在尼泊尔的第三个水电站。它是运行河水电站的仙人河河畔。它的容量为 2.4 兆瓦,从 0.8 3 单位每兆瓦。每个单元的原动力是水平 Francis 涡轮机。这个电站位于 Khopasi,Kavre 区,加德满都以东 35 公里处。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭