求翻译:The stability check for the worst case of three phase fault on the 132 kV bus bar of the Zhenfa Solar power plant substation followed by the final trip of 132 kV circuit connected to this substation has been performed for fault clearing of 9 cycles (180 ms) as understood to be the maximum fault clearing time of 132 kV 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The stability check for the worst case of three phase fault on the 132 kV bus bar of the Zhenfa Solar power plant substation followed by the final trip of 132 kV circuit connected to this substation has been performed for fault clearing of 9 cycles (180 ms) as understood to be the maximum fault clearing time of 132 kV
问题补充:

  • 匿名
2013-05-23 12:21:38
null
  • 匿名
2013-05-23 12:23:18
稳定的检查为最坏的情况下的三个阶段上的 132 kV 母线的振发太阳能发电厂变电站。其次是最后的旅程 132 kV 电路连接到该变电站已执行了故障清除 , 9 个周期 ( 1.8 ms ) 理解为“最大的故障清除时间的 132 kV 保护系统
  • 匿名
2013-05-23 12:24:58
稳定检查对于最坏三相缺点在太阳能植物分站被132千伏电路最后的旅行跟随连接到这个分站Zhenfa的132千伏母线为9周期180女士排除故障 (执行了) 如被了解是132千伏安全系统的最大排除故障时期
  • 匿名
2013-05-23 12:26:38
故障清除 9 周期 (180 ms) 的理解是最大的故障清除时间的 132 kV 保护系统进行了稳定性检查阵法太阳能发电厂变电站依次连接到此变电站的 132 千伏电路最后一趟 132 kV 母线上的三个单相故障最坏的情况
  • 匿名
2013-05-23 12:28:18