求翻译:58. The EIRR of the project was calculated by comparing the economic costs and benefits over a period of 25 years, including 5 years construction and 20 years operation. The evaluation was carried out for each subproject as well as for the whole project. The evaluation results shown that the EIRR was 17.6 percent for t是什么意思?

待解决 悬赏分:1 - 离问题结束还有
58. The EIRR of the project was calculated by comparing the economic costs and benefits over a period of 25 years, including 5 years construction and 20 years operation. The evaluation was carried out for each subproject as well as for the whole project. The evaluation results shown that the EIRR was 17.6 percent for t
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
58 . * 《 EIRR 的项目的计算方法是比较经济的成本和收益的 25 年 , 包括 5 年的建设和 20 多年的操作。 评价是进行每个的子项目以及整个项目的。 评估结果显示 , EIRR 是 17.6 左右整个项目的 , 高于世界银行建议的经济机会的资本成本 ( 12 % ) 。 因此 , 该项目被认为是经济可行的。
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
58 项目.计算了 25 年,包括 5 年的建设和 20 年运行一段比较的经济成本和效益。每个子项目以及对于整个项目进行评价。评价结果表明,是为整个项目,是高于世界银行建议资本 (12%) 的经济机会成本的 17.6%。因此,该项目被认为是经济可行。敏感性分析发现,大部分的测试用例为 EIRRs 高于 12%。在资本和 O & M 成本增加 20%20%结合降低的好处,会降到估计的 10.9%,为整个项目。这表明,该项目具有合适的经济可行性。从敏感性分析结果,可以看出是对投资成本与收益的变化最为敏感。因此,政府应仔细控制在项目实施过程的投资成本。在操作期间,各国政府和运营商应给予足够重