当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Set up a change control board. In highly structured project environments, such a group is responsible for “gathering information about the impact that a proposed change will have on the schedule, budget, or scope; voting on the proposed change; and then sending a request-for-change document on for the project sponsors’是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Set up a change control board. In highly structured project environments, such a group is responsible for “gathering information about the impact that a proposed change will have on the schedule, budget, or scope; voting on the proposed change; and then sending a request-for-change document on for the project sponsors’
问题补充:

  • 匿名
2013-05-23 12:21:38
null
  • 匿名
2013-05-23 12:23:18
设置更改控制板。 在高度结构化的项目环境中, 这一组负责"收集有关影响建议的改变将对计划、预算、或范围; 投票对建议的更改; 然后发送请求的更改文档的项目提案国的签名,” Bob Tarne、一名高级顾问专注于 IT 和电信项目解决方案下午在宾夕法尼亚州。
  • 匿名
2013-05-23 12:24:58
设定变动控制板。 在高度被构造的项目环境,这样小组负责“收集关于提出的变动在日程表、预算或者范围将有的冲击的信息; 投票对提出的变动; 然后送请求为改变文件为计划赞助者’署名”的一位资深顾问说鲍伯Tarne,在宾夕法尼亚专门研究它和电信项目为PM解答。
  • 匿名
2013-05-23 12:26:38
建立变更控制委员会。在高度结构化的项目环境中,这样一个小组负责"收集信息的影响,建议作出的改变会对计划、 预算或范围;表决的建议的更改;然后发送请求的更改文档项目发起人的签字,"说鲍勃汲水,从事资讯科技及电讯项目为 PM 解决方案在宾夕法尼亚州的高级顾问。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭