当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:During the test, the power contacts base are short-circuited. The accessible parts of insulating material of the bulb body are covered with a metal film. Initially no more than half the prescribed test voltage is applied between the contacts and the metal film. The voltage is then gradually increased to the full amount是什么意思?

待解决 悬赏分:1 - 离问题结束还有
During the test, the power contacts base are short-circuited. The accessible parts of insulating material of the bulb body are covered with a metal film. Initially no more than half the prescribed test voltage is applied between the contacts and the metal film. The voltage is then gradually increased to the full amount
问题补充:

  • 匿名
2013-05-23 12:21:38
null
  • 匿名
2013-05-23 12:23:18
在测试期间,电源触点基座都是短路的。 可访问的零部件的绝缘材料的灯泡体覆盖有金属膜。 最初没有超过一半的订明的测试电压之间的联系和金属膜。 电再逐渐增至全量。
  • 匿名
2013-05-23 12:24:58
在测试期间,力量联络基地短路。 电灯泡身体的绝缘材料的容易接近的部分用金属膜报道。 最初没有比一半被规定的测试电压是应用的在联络和金属膜之间。 电压逐渐然后增加到总额。
  • 匿名
2013-05-23 12:26:38
在测试期间,电力接触基地是短路。保温材料的泡体的可访问部分覆盖着金属膜。最初不超过一半,指明的测试电压联系人和金属膜之间。电压是然后逐渐增加到全额。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭