当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The Main Contractor shall provide free of charge and full use of temporary power supply including providing artificial lighting, minimum one lamp at not more than 1200 square feet of floor area and at every staircases, M & E rooms, lift pits and shafts and shall pay the costs of all electricity used by Nominated Sub-Co是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The Main Contractor shall provide free of charge and full use of temporary power supply including providing artificial lighting, minimum one lamp at not more than 1200 square feet of floor area and at every staircases, M & E rooms, lift pits and shafts and shall pay the costs of all electricity used by Nominated Sub-Co
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
主要的承建商须提供免费的和充分利用临时电源供应包括提供人工照明,最小一只灯的价格不超过1200平方英尺的面积和每个楼梯、M&E房、电梯坑和轴和应支付的费用的所有用电的积金局提名包括电源的测试和试运行的空调和通风设备、升降机和电力装置。
  • 匿名
2013-05-23 12:24:58
主要承包商免费将提供和对临时电源的充分的用途包括提供人为照明设备,极小值一灯在不超过1200平方英尺房屋面积和在每楼梯、M & E房间、推力坑和轴,并且支付被提名的转承包商使用的所有电的费用包括力量测试和委任空调和透气、推力和电子设施。 在要求永久供应为一个submeter或协议测试设施 (然后安排根据一个估计的依据情况下) 由转承包商做获得退款对所有者。
  • 匿名
2013-05-23 12:26:38
主要承包商应提供临时电源供应包括充分利用免费提供人工照明,最小的一盏灯,在不超过 1200 平方呎楼面面积,每个楼梯,M & E 房间,电梯坑和轴和应的支付的所有电力成本由提名的分包商使用包括力量为测试和调试的空气调节和通风.升降机和电气装置。事件中永久的供应是需要对安装进行测试,然后为 submeter (或估计的基础上协议) 作出安排由分包商偿还给所有者。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭