求翻译:The Nominated Sub-Contractor shall supply the inserts, bolts, sleeves, etc. and will locate for the Main Contractor the correct positions of these fittings. The Nominated Sub-Contractors shall be responsible for sealing between sleeves and piping, duct, etc. whereas the Main Contractor shall be responsible for sealing 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The Nominated Sub-Contractor shall supply the inserts, bolts, sleeves, etc. and will locate for the Main Contractor the correct positions of these fittings. The Nominated Sub-Contractors shall be responsible for sealing between sleeves and piping, duct, etc. whereas the Main Contractor shall be responsible for sealing
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
获提名的次承判商介入法律程序的应提供的插件、螺栓、套管等,并将找到的主要承包商的正确的立场,这些配件。 获提名的积金局须负责之间的密封套管和管道、风道等而主承包商应负责之間的密封套管和建筑的结构。
  • 匿名
2013-05-23 12:24:58
被提名的转承包商将供应插入物、螺栓、袖子等等。 并且为主要承包商将设置这些配件的正确位置。 被提名的转承包商将负责对密封在袖子之间和管道系统、输送管等等。 而主要承包商将负责对密封在袖子和建筑结构之间。
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 