|
关注:1
2013-05-23 12:21
求翻译:Interest during construction has also been worked out on the basis of construction period of 12 months, 10 months and 8 months for three types of small, medium and large capacity projects. LIBOR 0.31% with a premium of 4.5% has been used for calculation of interest during construction.是什么意思?![]() ![]() Interest during construction has also been worked out on the basis of construction period of 12 months, 10 months and 8 months for three types of small, medium and large capacity projects. LIBOR 0.31% with a premium of 4.5% has been used for calculation of interest during construction.
问题补充: |
|
2013-05-23 12:21:38
null
|
|
2013-05-23 12:23:18
兴趣在建造期间也已基础上制订的,建设期为12个月、10个月和8个月的三种类型的小型、中型和大型项目的能力。 伦敦银行同业拆息0.31%的溢价,4.5%已经被用于计算利息在建设中。
|
|
2013-05-23 12:24:58
兴趣在建筑期间根据12个月、10个月和8个月的基建期间也解决了为小,中等和大量项目的三个类型。 LIBOR 0.31%以保险费4.5%为演算利益使用了在建筑期间。
|
|
2013-05-23 12:26:38
施工期间的利息也了 12 个月,10 月和 8 月三种类型的小型、 中型和大型的能力项目建设期。伦敦银行同业拆息 0.31%与 4.5%的保费已用于施工期间计算利息。
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区