当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Construction of a waste oil storage area which will be an impervious, bunded area, with a graded ramp, to allow access for collection vehicles. The volume of the bund will conform to agreed volumes, i.e. 110% of the largest container or 25% of the cumulative total storage volume, whichever is greater;是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Construction of a waste oil storage area which will be an impervious, bunded area, with a graded ramp, to allow access for collection vehicles. The volume of the bund will conform to agreed volumes, i.e. 110% of the largest container or 25% of the cumulative total storage volume, whichever is greater;
问题补充:

  • 匿名
2013-05-23 12:21:38
null
  • 匿名
2013-05-23 12:23:18
建设废机油存储区域将有不透水层,以便盛装区的分级的坡道,以允许访问集合中的车辆。 该卷的外滩将符合商定的卷,即110%的最大的集装箱或25%的累计总存储量、较大;
  • 匿名
2013-05-23 12:24:58
将是不渗透的一个废油料储存区域的建筑, bunded区域,与一架被分级的舷梯,允许通入为汇集车。 bund的容量将依照同意的容量,即。 110%最大的容器或25%累计总数存贮容量,哪些是更加伟大的;
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭