求翻译:The storage area has been partly backfilled by the former contractor, but not to the intended level of +5.5m. Design of land reclamation and ground improvement shall be performed on the basis of existing works是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The storage area has been partly backfilled by the former contractor, but not to the intended level of +5.5m. Design of land reclamation and ground improvement shall be performed on the basis of existing works
问题补充:

  • 匿名
2013-05-23 12:21:38
null
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
贮存区部分被重新了填没由前承包商,但不对+5.5m的意欲的水平。 开垦荒地和地面改善设计根据现有的工作将执行
  • 匿名
2013-05-23 12:26:38
存储区已部分回填前的承包商,而不是预期的水平 + 5.5 m。应现有工程的基础上进行土地复垦和地面改进设计