|
关注:1
2013-05-23 12:21
求翻译:领导维修人员在3个半月内完成1400平米新厂房的电力、气动、供水和照明安装调试工作。完成设备的搬迁和重装工作.节省费用约10万元.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
领导维修人员在3个半月内完成1400平米新厂房的电力、气动、供水和照明安装调试工作。完成设备的搬迁和重装工作.节省费用约10万元.
问题补充: |
|
2013-05-23 12:21:38
Lead maintenance staff to complete in three and a half months of 1400 square meters of new power plants, air, water and lighting installation and commissioning work. Complete removal and reinstallation of equipment work cost savings of about 10 million.
|
|
2013-05-23 12:23:18
Leading maintenance personnel in three and a half months completed within 1400 m² of new plant electrical, pneumatic, water supply and lighting installation and debugging. Completion of the relocation and re-install the equipment cost savings of some 100,000 million . .
|
|
2013-05-23 12:24:58
The leadership serviceman completes 1400 square meter new workshop in 3 half a month the electric powers, air operated, the water supply and the illumination installs the debugging work.Completes the equipment moving with the rewiring work. Saves the expense approximately 100,000 Yuan.
|
|
2013-05-23 12:26:38
Lead maintenance personnel completed in 3.5 months of 1400 square meter new building installation work of electrical, air, water and lighting. Complete equipment relocation and reload work. cost savings of about $ 100,000.
|
|
2013-05-23 12:28:18
Lead maintenance personnel completed in 3.5 months of 1400 square meter new building installation work of electrical, air, water and lighting. Complete equipment relocation and reload work. cost savings of about $ 100,000.
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区