|
关注:1
2013-05-23 12:21
求翻译:测量208号门到奥迪T99涂装新建工地地面上主管道距地面上的距离,管道之间的间距。主管道支撑架的尺寸,每个支撑架之间的距离。是什么意思?![]() ![]() 测量208号门到奥迪T99涂装新建工地地面上主管道距地面上的距离,管道之间的间距。主管道支撑架的尺寸,每个支撑架之间的距离。
问题补充: |
|
2013-05-23 12:21:38
Audi 208 door-to-measure T99 coating head of the New Road site from the ground, the distance on the ground, the spacing between the pipes. Main channel supporting frames of size, the distance between each support frame.
|
|
2013-05-23 12:23:18
正在翻译,请等待...
|
|
2013-05-23 12:24:58
Surveys 208 gates to paint in the newly built work site ground to Audi T99 the main pipe line to be apart from in the ground the distance, between the pipeline spacing.Main pipe line carriage size, between each carriage distance.
|
|
2013-05-23 12:26:38
Measuring Gate No. 208 to the Audi T99 painting on the new site ground distance on the main pipeline from the ground, space between the pipe. The main pipe support frame sizes, distance between each bracket.
|
|
2013-05-23 12:28:18
Audi 208 door-to-measure T99 coating head of the New Road site from the ground, the distance on the ground, the spacing between the pipes. Main channel supporting frames of size, the distance between each support frame.
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区