当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:本报价不包括土建、机组雨棚、预留预埋、低压配电、防雷接地等费用;是什么意思?

待解决 悬赏分:1 - 离问题结束还有
本报价不包括土建、机组雨棚、预留预埋、低压配电、防雷接地等费用;
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
This quotation does not include construction, crew rain cover, set aside pre-buried, low-voltage distribution, and Lightning arrester, etc;
  • 匿名
2013-05-23 12:24:58
This quoted price including the construction, the unit canopy, the reservation in advance does not bury, expenses and so on low pressure power distribution, anti-radar earth;
  • 匿名
2013-05-23 12:26:38
This offer does not include construction, embedded, low-voltage power distribution unit of rain, reserved, lightning, and other costs;
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭