|
关注:1
2013-05-23 12:21
求翻译:1.黄海滩涂风电安装工况考察,了解地面通过性、潮汐水文资料、海工腐蚀工况。是什么意思?![]() ![]() 1.黄海滩涂风电安装工况考察,了解地面通过性、潮汐水文资料、海工腐蚀工况。
问题补充: |
|
2013-05-23 12:21:38
A Yellow Sea tidal flats wind power installation inspection of working conditions, to understand the ground through sexual tidal hydrological data, marine corrosion working conditions.
|
|
2013-05-23 12:23:18
1) 28023 -mode tour shoals wind power installation, through understanding of ground, sea, and tidal hydrological information tuned the corrosion.
|
|
2013-05-23 12:24:58
1. Yellow Sea shallow seas and tidelands wind electricity installment operating mode inspection, understood the ground passes the natural, the tide hydrological data, the sea labor corrosion operating mode.
|
|
2013-05-23 12:26:38
1. beach wind power installation condition inspection in the Yellow Sea, understand the ground through, tides, marine corrosion condition of hydrological data.
|
|
2013-05-23 12:28:18
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区