|
关注:1
2013-05-23 12:21
求翻译:现有废品间南侧道路大致解决方案: 保留现有,新路与老路有坎kerb,此处道路宽4m是什么意思? 待解决
悬赏分:1
- 离问题结束还有
现有废品间南侧道路大致解决方案: 保留现有,新路与老路有坎kerb,此处道路宽4m
问题补充: |
|
2013-05-23 12:21:38
Roughly south side of the road in the existing waste solution: Hom kerb retain existing, new road and the old road, where road width to 4m
|
|
2013-05-23 12:23:18
Existing waste-Road South approximately solution: Keep your existing, new and old, here is the kerb road width 4M
|
|
2013-05-23 12:24:58
正在翻译,请等待...
|
|
2013-05-23 12:26:38
South side road between the existing waste solutions: retaining existing, new Ridge Road, and the old road kerb, road width here 4m
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区