当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:4.4.3我公司完成修正的资料应由航空器营运人的工程部门评估批准后使用。对移交的修正资料应说明是属于长期更改还是临时更改,以使对方能够明确修正资料的正确使用和管理。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
4.4.3我公司完成修正的资料应由航空器营运人的工程部门评估批准后使用。对移交的修正资料应说明是属于长期更改还是临时更改,以使对方能够明确修正资料的正确使用和管理。
问题补充:

  • 匿名
2013-05-23 12:21:38
4.4.3 I have completed the engineering department of correction data by the aircraft operator to use assessment upon approval. The transfer of correction data should indicate a long-term changes or temporary changes to each other to clearly fix the proper use and management of information.
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
4.4.3 the company achieve compliance information should be assessed by the Engineering Department of the aircraft operator approval. Amendments to transfer information on should be a long-term change is temporary, so the other side can give a clear amendment to proper use and management of informati
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭