当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:为此,除了应用传统的建设项目成本控制方法外,还要延伸建立建设项目档案长期保存制度是什么意思?

待解决 悬赏分:1 - 离问题结束还有
为此,除了应用传统的建设项目成本控制方法外,还要延伸建立建设项目档案长期保存制度
问题补充:

  • 匿名
2013-05-23 12:21:38
To this end, in addition to the application of traditional construction project cost control methods, but also extends to the establishment of a construction project file system of long-term preservation
  • 匿名
2013-05-23 12:23:18
For this reason, in addition to applying traditional construction project cost control methods, we must also extend a long-term building project files saved system
  • 匿名
2013-05-23 12:24:58
Therefore, besides application tradition items of basic construction cost control method, but also must extend the establishment items of basic construction file long-term preservation system
  • 匿名
2013-05-23 12:26:38
To this end, in addition to the traditional methods of construction project cost control, also extends to building construction preserving file system
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭