当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:反馈给以后建设项目的决策和设计,达到控制的目的是什么意思?

待解决 悬赏分:1 - 离问题结束还有
反馈给以后建设项目的决策和设计,达到控制的目的
问题补充:

  • 匿名
2013-05-23 12:21:38
Feedback to decision-making and design of future construction projects, to achieve control
  • 匿名
2013-05-23 12:23:18
Feedback is given to future construction projects in the decision-making and design, to achieve control of the end
  • 匿名
2013-05-23 12:24:58
The feedback for later items of basic construction decision-making and the design, achieves the control the goal
  • 匿名
2013-05-23 12:26:38
Feedback to decision making and design of construction projects in the future, achieve the purpose of control
  • 匿名
2013-05-23 12:28:18
feedback to future construction projects in the decision-making and design, and control purposes;
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭