|
关注:1
2013-05-23 12:21
求翻译:但由于道路施工存在着工期长、流动性大、工程量大、工序复杂等特点、使其在施工过程中存在很多安全问题是什么意思? 待解决
悬赏分:1
- 离问题结束还有
但由于道路施工存在着工期长、流动性大、工程量大、工序复杂等特点、使其在施工过程中存在很多安全问题
问题补充: |
|
2013-05-23 12:21:38
However, due to road construction, the existence of long duration, liquidity, large projects, processes and complex characteristics, there are many security issues in the construction process
|
|
2013-05-23 12:23:18
However, due to road construction project, there is a high level of mobility, the engineering of large complex processes, such as the character, in the course of construction there are many security issues
|
|
2013-05-23 12:24:58
But because the roadbuilding has the time limit for a project long, the fluidity big, the resilience big, the working procedure complex and so on the characteristics, causes it to have the very many security problem in the construction process
|
|
2013-05-23 12:26:38
正在翻译,请等待...
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区