当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:因工程设计变更,不能及时确定施工方案或增加施工难度及工程量。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
因工程设计变更,不能及时确定施工方案或增加施工难度及工程量。
问题补充:

  • 匿名
2013-05-23 12:21:38
Due to engineering design changes and can not determine the construction program or increase the difficulty of construction and engineering quantity.
  • 匿名
2013-05-23 12:23:18
The engineering change, in a timely manner or identify a construction program increased construction and difficulty.
  • 匿名
2013-05-23 12:24:58
Because of the engineering design change, cannot determine the construction plan or the increase construction difficulty and the resilience promptly.
  • 匿名
2013-05-23 12:26:38
Due to design changes cannot be determined in a timely manner or increase the difficulty of construction and engineering of the construction programme.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 